Greenhouse:
All of the trim work has been completed. Next will be the installation of the overhead and pedestrian doors. We still have to clean up some building materials, but we are generally ready to move on to the next step of installing the ETFE glazing.
Cattle:
The cattle are back from grazing the BLM.
Chicken Coops:
All three coops are being developed simultaneously.
Nursery:
The team has been burning the midnight oil getting these pavers cut and installed. They look great and the building is really starting to shape up. We are almost ready to begin assembling the steel tables.